MIDC / SEEPZ
Mumbai's largest export-processing zone — IT, gems, jewellery, and SEZ operations.
Five minutes to the metro. Three minutes to the highway. Seven minutes to the international terminal. At 153 East, the city does not happen in traffic — it happens in arrivals.
All distances measured from the 153 East site at CTS 153A/154C, J.B. Nagar, Andheri East.
Drive times indicative — subject to traffic. Source: Official 153 East brochure.
Andheri East is Mumbai's quiet centre of commerce. From 153 East, the city's biggest employment hubs are not a planning project — they are a route.
Mumbai's largest export-processing zone — IT, gems, jewellery, and SEZ operations.
Mumbai's financial district — banks, consulting, MNC headquarters.
IT corridor — Hiranandani Business Park, L&T Infotech, TCS, and more.
Media, advertising, and fashion HQs — One Indiabulls Centre, Phoenix Mills.
The best commute is the one short enough to be a routine, not a story.
Drive times indicative — subject to traffic conditions and route.
The distances and approximate drive times listed are sourced from the official 153 East brochure and measured from CTS 153A/154C, J.B. Nagar. Times vary with traffic — peak hours can add 5–10 minutes, off-peak is often faster.
JB Nagar Metro Station is on Mumbai Metro Line 7 (Andheri East–Dahisar East corridor), with planned interchanges that connect to Line 3 (Aqua Line) for direct access to BKC, Worli, and South Mumbai.
Approximately 3 minutes by car. The site enjoys direct vehicular access to the WEH, which connects northward to Borivali and southward to BKC and the Bandra-Worli Sea Link.
Bombay Cambridge School is approximately 2 minutes away. Several other reputed schools are within a 3-km radius — site visit handover documents include a full education map.
The brochure connectivity map is indicative, not to scale, and is intended to convey relative position. The exact site location is verifiable on Google Maps via the QR code in the brochure.
Whether you’re a first-time homebuyer, upgrading your family home, or making an investment — our team is ready to guide you through every step. No pressure, only clarity.
Your information is 100% confidential. No spam, ever.
Disclaimer: This website is for informational purposes only. All images, floor plans and specifications are indicative and subject to change without notice. Please refer to registered MahaRERA project documents for official details. MahaRERA Reg. No: PR1180002502968. Possession subject to RERA timeline ending 31 December 2028.
WhatsApp us